How We Build

Vertically integrated from land to lease. One team, one platform, zero handoff waste.

The Fragmentation Problem

Traditional housing delivery chains work against themselves. The developer, architect, engineer, prefab supplier, general contractor, and trades are each separate businesses with separate incentives. Every handoff is a delay. Every interface is a source of error.

MASIV collapses the chain. Land acquisition, design, permits, fabrication, and construction are controlled by one team, running on one platform: Superstudio. The result is faster timelines, lower costs, and buildings that perform as designed.

Developer
Architect
Engineer
Prefab Co.
GC
Trades
6 separate businesses
6× handoff delays
Misaligned incentives
One team. One platform. One incentive.

Five Steps,
One System

  1. Discover

    We identify areas of prosperity: inner-city lots with proximity to transit, employment, and amenities. Superstudio's land analysis module scores parcels on zoning capacity, infrastructure quality, and rental demand before we ever make an offer.

  2. Invest

    We acquire land and determine best use: how many units, what typology, what tenure. Because we control design and construction, our proforma is built from real cost data, not estimates. We know what we'll spend before we commit.

  3. Build Better

    We build faster and with less waste. Superstudio produces permit-ready drawings and feeds directly into our prefab fabrication workflow. Panels arrive on site pre-cut, pre-drilled, and sequenced for assembly, dramatically reducing labour hours and material waste.

  4. Sell or Rent

    We sell completed homes or retain them as long-term rental assets. Our rental hold strategy targets durable corridors: university districts, transit nodes, inner-city employment zones, where demand stays high and values appreciate over time.

  5. Improve

    Every project feeds back into the system. Each build generates cost data, schedule data, and design performance data that makes the next project faster and more precise. The system learns; the business gets better.

Conventional Build
vs. MASIV

Metric
Permit timeline
Design coordination
Framing method
Material waste
Cost certainty
Decision speed
Traditional
12–18 weeks
Architect, consultant, trades: separate
Stick-frame on site
Industry average: ~30%
Estimate-based
Multi-party approvals
MASIV
Under 6 weeks
One team, one platform
Prefab panels off-site
Reduced at source
Data-driven from past builds
Internal, day-of

See It in the Numbers

Four projects built. Timelines compressed. Housing delivered. The portfolio speaks to what the process can do.